Assembly Instructions: 5050-M1L CH (Danica)
IMPORTANT:
• ALL INSTALLATION WORK SHOULD BE DONE BY ACCREDITED PROFESSIONAL.
• SHUT OFF POWER SUPPLY AT FUSE OR CIRCUIT BREAKER!
• USE ONLY THE SPECIFIED BULBS. DO NOT EXCEED THE MAXIMUM WATTAGE!
PREPARING FOR INSTALLATION
Carefully remove all of the contents from the carton. See the
important notes above. Shut off the power at the circuit breaker
andcompletelyremovetheoldxturefromthewall,including
theoldmountingstrap.
Mountingstrap(B)containsseveralpairsofthreadedholes.Find
thepairofholesthatmatchesthespacingoftheholesonthe
junctionboxandyourxturebackplate.Twoofmountingscrews
(A)shouldbeattachedtomountingstrap(B).Youmayneedto
tightennuts(C)thatholdthesescrewsinplace.Pullthehouse
wiresthroughthecenterofmountingstrap(B).Placemounting
strap(B)overthejunctionboxsothatmountingscrews(A)are
vertical,andinalignmentwiththeholelocationsoncanopy(F).
Securemountingstrap(B)tothejunctionboxwithmounting
screws(D)andascrewdriver.Tightenthescrewssecurely.
Bymeasuring,determinethecorrectamountofdecorative
chain(K)andcablewire(L)neededforproperhangingheight.
Toshortenthexture,trimthewirestothedesiredlengthplus
at least 8 to 10 inches. Unhook and discard any unwanted
decorativechain(K).Putthewirethroughnipple(H)ofcanopy
(F).
CONNECTING THE WIRES
Haveanassistantsupportthextureweightwhilecompleting
thewiring.Cutawayanyexcesswires.Threadthexturewires
throughcanopy(F).Attachthexture’swirestothepower
supplywiresfromthejunctionbox.Connectblacktoblack(or
smooth);whitetowhite(orribbed);groundtoground(greenor
copper).Twisttheendsofthewirepairstogether,thentwiston
a wire connector. Make sure all twists are in the same direction.
Ifthereisnogroundwire(greenorcopper)fromthejunction
box,locategroundscrew(E)onmountingstrap(B)andwrap
thexturegroundwirearoundthegreengroundscrew(E).Use
ascrewdrivertosecuregroundscrew(E)ontothemounting
bracket.Tuckallwiresneatlyintothejunctionbox.
FINISHING THE INSTALLATION
Pushcanopy(F)uptotheceilingsothatmountingscrews(A)
protrudethroughtheholesincanopy(F).Securecanopy(F)
totheceilingbytightlythreadingdecorativenuts(G)ontothe
screws. Slide shade (J) over socket (I) and secure in place with
socketring(K).
Installthelightbulbs(notincluded)inaccordancewith
thexture’sspecications.Donotexceedthemaximum
recommendedwattage.
Your installation is now complete. Turn on the power and test
thexture.
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn off the light and wipe down the
xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture.
For Customer Service, contact
the place of purchase to arrange
for replacement parts.
I
J
K
A
D
B
C
E
L
M
G
F
H
Comments to this Manuals